MAIN PROJECTS UNDERTAKEN

CONNECTING ELECTRICITY CONSUMERS AND PRODUCERS TO THE National Power Grid

Solution studies, consultancy and technical assistance for obtaining ATR -Technical approval for connection and CR - Connection agreement

Consumers:
  • Logistic park OARJA, Arges county - 9 MW
  • District center, BUNA ZIUA District, Cluj county – 3.73 MW
  • Industrial park ,,REIF'' Campia Turzii, Cluj county – 5.2 MW
Photovoltaic Power Plant:
  • GATAIA, Timis county - 32MW
  • SANNICOLAU MARE, Timis county - 7.04 MW
  • IAZ, Caras–Severin county - 48MW
  • MOSNITA NOUA, Timis county - 49MW
  • BAZOS, Timis county - 77 MW
  • LOVRIN 3, Timis county - 48.9 MW
  • SEGARCEA, county Dolj – 48 MW
Hydro Power Plant:
  • BUMBESTI, Gorj county - 40.5 MW
  • BOIA, Valcea county - 11.68 MW
  • ROBESTI, Valcea county - 36.8 MW
Cogeneration Power Plant:
  • HOREZU, Valcea county - 4.13 MW
  • SC ZAHARUL ORADEA SA, Bihor county - 5 MW

ELECTRICAL SUBSTATIONS 400 kV

Replacing the suspense insulation belonging to the 400 kV bus bar and the 400 kV assemblies link from 400 kV BRASOV electrical substation (CN TRANSELECTRICA S.A. - ST Sibiu)

OUTDOOR 220 kV/MT ELECTRICAL SUBSTATIONS

Electrical substation 220;110/20 kV CAMPIA TURZII refurbishment (CN TRANSELECTRICA S.A. - ST Cluj)

OUTDOOR 110/MT kV ELECTRICAL SUBSTATIONS

FANTANELE WIND PARK & COGEALAC, the largest onshore wind farm in Europe, with an installed capacity of approx. 600MW (ENEL Distribution Dobrogea)

PHOTOVOLTAIC PARK PARAU 54 MW, Brasov county – electrical substation 110/20 kV – 3*25MVA PARAU (FDEE Electrica Distributie Transilvania Sud S.A – SDEE Brasov)

Refurbishing of 110/20 kV MANASTUR electrical substation and 20 kV bus bar design (FDEE Electrica Distributie Transilvania Nord S.A. – SDEE Cluj-Napoca)

Works on 110/20 kV JUCU electrical substation (FDEE Electrica Distributie Transilvania Nord S.A. – SDEE Cluj Napoca)

DESIGN FRAMEWORK AGREEMENT – Electrical substations belonging to CEZ Distributie SA, 2009-2011, for 7 Romanian counties.

Refurbishing of 110/20 kV PATROAIA electrical substation (CEZ Distributie S.A.)

Refurbishing of 110/20 kV ROSIORI electrical substation (CEZ Distributie S.A.)

INTERIOR 110/20 KV ELECTRICAL SUBSTATIONS

Electrical substations 110/20 kV POLUS Shopping CENTER CLUJ (FDEE Electrica Distributie Transilvania Nord S.A. – SDEE Cluj Napoca)

OHL 110 kV-220 kV Overhead power lines

OHL 220 kV TIHAU-BAIA MARE 3 overhead power line repairs (CN TRANSELECTRICA S.A. – ST Cluj)

Major maintenance OHL 220 kV IERNUT-UNGHENI 1 overhead power line (CN TRANSELECTRICA S.A. – ST Cluj)

OHL 110 kV overhead power line connection for the 110 kV CEF SEGARCEA electrical substation (CEZ Distributie S.A.)

UGL 110 kV underground power lines

Power supply EGGER ROMANIA - UGL 110 kV RADAUTI - HURMUZACHII

Refurbishing of underground power line UGL 110 kV CRAIOVA CENTRE-CRAIOVITA, county DOLJ